With our public disclosure made by February 18, 2026, it was announced that trial productions had begun at our Sarıalan Gold Mine Site.
As of today, the trial production process have successfully been completed, and full-capacity production have already been commenced. During the trial production period, a total of 14,450 ounces of gold concentrate were produced (upto September 15, 2026).
This is the English translation of the original disclosure in Turkish. In case of any discrepancy between the Turkish and English versions, the Turkish version shall prevail.